Termite Control for Existing Homes in Mumbai
Protect your completed structure long-term — for homes, societies and businesses across Mumbai, Thane & Navi Mumbai.
Same Day Available
Emergency Response
1 – 3 Hours
Treatment Duration
30-Day Guarantee
Free Re-Treatment
Eco-Certified
Family & Pet Safe
Quick answer
Post-construction termite treatment is for buildings that are already standing. Holes are drilled along the foundation and termiticide is injected into the soil, wall voids are treated where termites are active, and the holes are sealed afterwards.
About Our Post-Termite Control
Post-construction anti-termite treatment creates a long-lasting chemical barrier around existing structures to prevent subterranean termite attacks. Our licensed specialists use soil injection, drilling, and chemical infusion techniques for comprehensive protection.
In Mumbai, subterranean termites usually reach flats and bungalows through cracks in the ground floor, wall–floor joints, and damp walls, then feed on door frames, wooden wardrobes and modular kitchen boards. Older buildings with seepage are especially prone. Common signs are thin mud tubes on walls, hollow-sounding or powdery wood, and winged termites near lights after the first monsoon showers. This post-construction treatment is for buildings that are already built; for a building under construction, see pre-termite treatment instead.
Related: Termite guide: signs and damage · Pre-construction termite treatment · Wood borer control · Pest control pricing
Starting Price
Final pricing depends on property size, access, and treatment intensity.
How Our Post-Termite Control Works
A proven 4-step process — from first inspection to final follow-up — ensuring complete and lasting pest elimination.
Termite Inspection
We inspect for active termite activity, mud tubes, damaged wood, and moisture-prone areas.
Drilling & Injection
Holes drilled along the foundation and termiticide injected into the soil under pressure.
Wall Void Treatment
Wall voids and junction areas treated with foam to eliminate existing colonies inside walls.
Annual Inspection
Annual warranty visits check for new termite activity and renew the chemical barrier as needed.
Common Questions
Have a question about our post-termite control service? Here are the most common queries.
Didn't Find Your Answer?
Contact us directly for service-specific questions.
Pre-construction vs post-construction termite treatment
| Pre-construction | Post-construction | |
|---|---|---|
| Building stage | New building, while the foundation is still open | Building already standing |
| How the soil is reached | Soil surfaces treated directly before PCC and before the slab is cast | Holes drilled along the foundation and termiticide injected into the soil |
| Walls | Perimeter walls treated during backfilling | Wall voids and junctions treated where termites are active |
| Who to coordinate with | Builder and site engineer | Residents or society |
| Learn more | Pre-construction guide | Signs of termites |
After-care tips
- Do not break mud tubes before the inspection. They show where termites are travelling.
- Keep the sealed drill holes intact and avoid washing those floor edges for a few days.
- Fix leaks and damp walls, which attract termites.
- Move stored wood and cartons away from walls.
Read the full guide:Signs of termites →How to get rid of termites →
Where we run post-termite control
Area pages: Pest control in Andheri · Pest control in Malad · Pest control in Kalyan
Ready to Eliminate Post-Termite Control?
Free inspection. Same-day service. 30-day guarantee. Our experts are standing by.




